Office & Commercial Archives - Mechonik
Skip to content Skip to footer

Projects

Office & Commercial

With a robust legacy in the commercial sector, our expertise extends seamlessly to deliver high-standard projects, including back-to-base builds, effortlessly. Leveraging our deep-rooted experience, we consistently exceed expectations in commercial enviroments.

AAMI-Park
AAMI Park Corporate Bar

Fit out of media broadcast and lounge areas


Renascent

NDY

COX

$800K-1.2M

2023

Supply, install and commission:

  • FCUs and associated water system additions and modifications
  • Ventilation systems for amenity and safety.
  • Integration of fitout system into base building BMS


Epic-Expansion
Epic Expansion

Fit out of 3 commercial office levels

L1, 2 & 5, 1-9 Sackville st, Collingwood


VEMI

EVOLVED Engineering

M Moser Associates

$800K-1M

2024

Supply, install and commission:

  • Modification of base building VRF Air Conditioning System
  • New tenancy VRF Air Conditioning System integrated into the base building system
  • Integration of fitout system into base building BMS


CERA-Lighthouse
Cera Lighthouse

Laboratory fitout to a newly constructed base building

Fitout and modifications to an existing medical research space


Arete

Waterman

STH

$1.5-2M

2024

Supply, install and commission:

  • Dedicated 4 pipe heat pump thermal plant and associated water system serving the PC2 lab.
  • FCUs with humidity control serving the PC2 lab under negative pressure
  • Ventilation systems for amenity and safety.
  • Medical and laboratory gases
  • Dedicated fitout BMS with integration into the base building system


55-Collins
55 Collins St

Refurbishment and back to base building works of levels 33 and 45 at 55 Collins Street, a multi-level mixed use building located in the CBD predominantly serving offices


Plan Group

NDY

Grimshaw

$1.2-1.8M

2023

Supply, install and commission:

  • Base building passive fire protection upgrades to the floor
  • Replacement of VAV boxes with new low pressure units and heating coils
  • Replacement of secondary chilled water perimeter induction boxes with new low pressure units
  • BMS modernisation


marvel-stadium
Marvel Stadium Feature Bar

Fit out of a high-end Food & Beverage retail facility


Plan Group

CALEB Engineers\Waterman

Hachem

$1.2-1.8M

2024

Supply, install and commission:

  • FCUs and associated water system additions and modifications
  • Rooftop ERVs and Packaged Air Conditioning Units
  • Ventilation systems for amenity and safety.
  • Integration of fitout system into base building BMS