Sorry, you have been blocked

You are unable to access thailand-u31.com

Why have I been blocked?

This website is using a security service to protect itself from online attacks. The action you just performed triggered the security solution. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data.

What can I do to resolve this?

You can email the site owner to let them know you were blocked. Please include what you were doing when this page came up and the Cloudflare Ray ID found at the bottom of this page.

55 Collins St - Mechonik
Skip to content Skip to footer

|

Office, Commercial and Apartment

55 Collins St

About this Project

Refurbishment and back to base building works of levels 33 and 45 at 55 Collins Street, a multi-level mixed use building located in the CBD predominantly serving offices

Plan Group

NDY

Grimshaw

$1.2-1.8M

2023

Supply, install and commission:

  • Base building passive fire protection upgrades to the floor
  • Replacement of VAV boxes with new low pressure units and heating coils
  • Replacement of secondary chilled water perimeter induction boxes with new low pressure units
  • BMS modernisation
testimonials

What clients say

0+
Years experience in HVAC engineering, construction and maintenance.
0+
Employees

Contact Us

Fill in the form below to send us a message.