Projects - Mechonik
Skip to content Skip to footer

Projects

Projects Of All Types Delivered

Top Projects

Phillip-Island
Phillip Island Community Hospital

Redevelopment of Phillip Island Health Hub include the following: Urgent Care, An integrated Day Medical Centre providing dialysis and chemotherapy, Public Dental, Specialist Clinics, Community Mental Health Services, and Alcohol and other Drug Services.


SJ Higgins

WSP\Waterman

HDR

$6-7M

2024

Supply, install and commission:

  • Thermal Plant comprised of 4 pipe simultaneous heating and cooling air cooled chillers, and associated closed loop water system.
  • Air handling plant featuring humidity control, heat recovery and infection control as approapriate to the area served.
  • Ventilation systems for amenity, heat rejection and safety.
  • Medical gases and a comprehensive BMS serving the hospital.


Blackburn-Surgical
Blackburn Surgical

An expansion to the existing Blackburn Public Surgery Centre consisting of 2 new additional Operating Theatres, Setup/Sterile Store, Patient Holding & Recovery, satellite CSSD and other associated support areas.


Plan Group

Collective Engineering

STH

$900K-1.2M

2024

Supply, install and commission:

  • AHU’s with humidity control.
  • VAVs to recovery and other associated support areas.
  • Ventilation systems for amenity, heat rejection and safety.
  • Medical gas and BMS modifications and additions.


marvel-stadium
Marvel Stadium Feature Bar

Fit out of a high-end Food & Beverage retail facility


Plan Group

CALEB Engineers\Waterman

Hachem

$1.2-1.8M

2024

Supply, install and commission:

  • FCUs and associated water system additions and modifications
  • Rooftop ERVs and Packaged Air Conditioning Units
  • Ventilation systems for amenity and safety.
  • Integration of fitout system into base building BMS


CERA-Lighthouse
Cera Lighthouse

Laboratory fitout to a newly constructed base building

Fitout and modifications to an existing medical research space


Arete

Waterman

STH

$1.5-2M

2024

Supply, install and commission:

  • Dedicated 4 pipe heat pump thermal plant and associated water system serving the PC2 lab.
  • FCUs with humidity control serving the PC2 lab under negative pressure
  • Ventilation systems for amenity and safety.
  • Medical and laboratory gases
  • Dedicated fitout BMS with integration into the base building system


West-Gate
West Gate Tunnel Project

Buildings supporting the tunnel including main Operartions Building, Maintenance, Substation, Major Switchroom Ventilation and Tech Shelter buildings


CPB/John Holland Joint Venture

Aurecon/Jacobs Joint Venture

WM

$3-4M

2024

Supply, install and commission:

  • Rooftop Packaged Air Conditioning Units
  • VRF Heat Recovery Air Conditioning Systems.
  • Ventilation systems for amenity, heat rejection and safety.
  • Site wide secure BMS for all buildings


Toyota
Toyota Powertrain Building, Altona

Conversion of the existing assembly building to an R&D facility


ADCO

Wood & Grieve

Peddle Thorp

$6-8M

2020

Supply, install and commission:

  • Water system refurbishment, modifications, and new boiler plant
  • New FCU, AHU, VAVs, ERVs, radiant heaters and evaporative coolers
  • Ventilation systems for amenity and safety.
  • Local exhaust systems including tailpipe, welding and dust extraction compressed air system
  • Integration of new systems into base building BMS


Contact Us