Projects
Projects Of All Types Delivered
Top Projects
Redevelopment of Phillip Island Health Hub include the following: Urgent Care, An integrated Day Medical Centre providing dialysis and chemotherapy, Public Dental, Specialist Clinics, Community Mental Health Services, and Alcohol and other Drug Services.
Key Statistics
Builder
SJ Higgins
Consultant
WSP\Waterman
Architect
HDR
Contract Value
$6-7M
Project Completion
2024
Project Scope
Supply, install and commission:
- Thermal Plant comprised of 4 pipe simultaneous heating and cooling air cooled chillers, and associated closed loop water system.
- Air handling plant featuring humidity control, heat recovery and infection control as approapriate to the area served.
- Ventilation systems for amenity, heat rejection and safety.
- Medical gases and a comprehensive BMS serving the hospital.
An expansion to the existing Blackburn Public Surgery Centre consisting of 2 new additional Operating Theatres, Setup/Sterile Store, Patient Holding & Recovery, satellite CSSD and other associated support areas.
Key Statistics
Builder
Plan Group
Consultant
Collective Engineering
Architect
STH
Contract Value
$900K-1.2M
Project Completion
2024
Project Scope
Supply, install and commission:
- AHU’s with humidity control.
- VAVs to recovery and other associated support areas.
- Ventilation systems for amenity, heat rejection and safety.
- Medical gas and BMS modifications and additions.
Fit out of a high-end Food & Beverage retail facility
Key Statistics
Builder
Plan Group
Consultant
CALEB Engineers\Waterman
Architect
Hachem
Contract Value
$1.2-1.8M
Project Completion
2024
Project Scope
Supply, install and commission:
- FCUs and associated water system additions and modifications
- Rooftop ERVs and Packaged Air Conditioning Units
- Ventilation systems for amenity and safety.
- Integration of fitout system into base building BMS
Laboratory fitout to a newly constructed base building
Fitout and modifications to an existing medical research space
Key Statistics
Builder
Arete
Consultant
Waterman
Architect
STH
Contract Value
$1.5-2M
Project Completion
2024
Project Scope
Supply, install and commission:
- Dedicated 4 pipe heat pump thermal plant and associated water system serving the PC2 lab.
- FCUs with humidity control serving the PC2 lab under negative pressure
- Ventilation systems for amenity and safety.
- Medical and laboratory gases
- Dedicated fitout BMS with integration into the base building system
Buildings supporting the tunnel including main Operartions Building, Maintenance, Substation, Major Switchroom Ventilation and Tech Shelter buildings
Key Statistics
Builder
CPB/John Holland Joint Venture
Consultant
Aurecon/Jacobs Joint Venture
Architect
WM
Contract Value
$3-4M
Project Completion
2024
Project Scope
Supply, install and commission:
- Rooftop Packaged Air Conditioning Units
- VRF Heat Recovery Air Conditioning Systems.
- Ventilation systems for amenity, heat rejection and safety.
- Site wide secure BMS for all buildings
Conversion of the existing assembly building to an R&D facility
Key Statistics
Builder
ADCO
Consultant
Wood & Grieve
Architect
Peddle Thorp
Contract Value
$6-8M
Project Completion
2020
Project Scope
Supply, install and commission:
- Water system refurbishment, modifications, and new boiler plant
- New FCU, AHU, VAVs, ERVs, radiant heaters and evaporative coolers
- Ventilation systems for amenity and safety.
- Local exhaust systems including tailpipe, welding and dust extraction compressed air system
- Integration of new systems into base building BMS