Projects
Office & Commercial
With a robust legacy in the commercial sector, our expertise extends seamlessly to deliver high-standard projects, including back-to-base builds, effortlessly. Leveraging our deep-rooted experience, we consistently exceed expectations in commercial enviroments.
Fit out of media broadcast and lounge areas
Key Statistics
Builder
Renascent
Consultant
NDY
Architect
COX
Contract Value
$800K-1.2M
Project Completion
2023
Project Scope
Supply, install and commission:
- FCUs and associated water system additions and modifications
- Ventilation systems for amenity and safety.
- Integration of fitout system into base building BMS
Fit out of 3 commercial office levels
L1, 2 & 5, 1-9 Sackville st, Collingwood
Key Statistics
Builder
VEMI
Consultant
EVOLVED Engineering
Architect
M Moser Associates
Contract Value
$800K-1M
Project Completion
2024
Project Scope
Supply, install and commission:
- Modification of base building VRF Air Conditioning System
- New tenancy VRF Air Conditioning System integrated into the base building system
- Integration of fitout system into base building BMS
Laboratory fitout to a newly constructed base building
Fitout and modifications to an existing medical research space
Key Statistics
Builder
Arete
Consultant
Waterman
Architect
STH
Contract Value
$1.5-2M
Project Completion
2024
Project Scope
Supply, install and commission:
- Dedicated 4 pipe heat pump thermal plant and associated water system serving the PC2 lab.
- FCUs with humidity control serving the PC2 lab under negative pressure
- Ventilation systems for amenity and safety.
- Medical and laboratory gases
- Dedicated fitout BMS with integration into the base building system
Refurbishment and back to base building works of levels 33 and 45 at 55 Collins Street, a multi-level mixed use building located in the CBD predominantly serving offices
Key Statistics
Builder
Plan Group
Consultant
NDY
Architect
Grimshaw
Contract Value
$1.2-1.8M
Project Completion
2023
Project Scope
Supply, install and commission:
- Base building passive fire protection upgrades to the floor
- Replacement of VAV boxes with new low pressure units and heating coils
- Replacement of secondary chilled water perimeter induction boxes with new low pressure units
- BMS modernisation
Fit out of a high-end Food & Beverage retail facility
Key Statistics
Builder
Plan Group
Consultant
CALEB Engineers\Waterman
Architect
Hachem
Contract Value
$1.2-1.8M
Project Completion
2024
Project Scope
Supply, install and commission:
- FCUs and associated water system additions and modifications
- Rooftop ERVs and Packaged Air Conditioning Units
- Ventilation systems for amenity and safety.
- Integration of fitout system into base building BMS